Yggdrasil
Hugin A
Systemoversikt
Hugin A
Rind
Fulla & Lille-Frigg
Langfjellet
Kraftstasjon
Hugin A
00-09
10-19
20-29
30-39
40-69
70-79
80-89
90-99
00-09
Reserved
10-19
10-19 Drilling, well and subsea related systems
- 10 Drilling
- 11 Drilling process
- 12 Drilling well control
- 13 Riser and well topside
- 14 Drilling control and monitoring
- 15 Drilling drain
- 18 Well and riser subsea
- 19 Subsea installation – maintenance and work over
20-29
20-29 Main process systems
- 20 Separation and stabilisation
- 21 Crude handling and metering
- 23 Gas compression and re-injection
- 24 Gas treatment
- 25 Gas conditioning
- 27 Gas export and metering
- 28 Gas sweetening
- 29 Water injection
30-39
30-39 Export and byproduct handling
- 30 Oil export line
- 31 Condensate export line
- 32 Gas export pipeline
- 33 Oil storage
- 34 Injection water pipeline
- 35 Chemical injection pipeline
- 36 Wellstream pipeline
- 37 Gas injection pipeline
- 38 Glycol / methanol regeneration
- 39 Loading
40-69
40- 69 Process support and utility systems
- 40 Cooling medium
- 41 Heating medium
- 42 Chemical injection
- 43 Flare
- 44 Oily water
- 45 Fuel gas
- 46 Methanol injection
- 47 Chlorination
- 50 Sea water
- 52 Ballast water
- 53 Fresh water
- 55 Steam
- 56 Open drain
- 57 Closed drain
- 58 Thruster and propulsion
- 61 Jet fuel
- 62 Diesel oil
- 63 Compressed air
- 64 Inert gas
- 65 Hydraulic power
- 66 Sewage treatment
- 69 Lubrication oil
70-79
70-79 Safety systems
- 70 Fire and gas detection
- 71 Fire water
- 72 Fire fighting
- 73 Material handling
- 75 Passive fire protection
- 76 Emergency preparedness
- 77 Environment protection
- 79 Emergency shutdown and blow down
80-89
80-89 Electrical
- 80 Main power (u =or >6.6 kV)
- 81 Main power (1.0 kV< u < 6.6 kV)
- 82 Main power (u = or <1.0 kV)
- 83 Emergency power (u = or >1.0 kV)
- 84 Emergency power (u<1.0 kV)
- 85 Battery and no-break
- 86 Telecommunication
- 87 Control
- 88 Earthing and lightning
90-99
90-99 Structural, civil, marine and architectural systems
- 90 Topside structure
- 91 Sub structure
- 92 Temporary
- 93 Architectural incl. Workshop and storage
- 94 Mooring and positioning
- 95 Onshore/civil
- 96 Subsea structure and template
- 97 HVAC
- 98 Corrosion protection
- 99 Area Completion
Rind
10-19 Drilling, well and subsea related systems
- 10 Drilling
- 11 Drilling process
- 12 Drilling well control
- 13 Riser and well topside
- 14 Drilling control and monitoring
- 15 Drilling drain
- 18 Well and riser subsea
- 19 Subsea installation – maintenance and work over
Fulla & Lille-Frigg
10-19 Drilling, well and subsea related systems
- 10 Drilling
- 11 Drilling process
- 12 Drilling well control
- 13 Riser and well topside
- 14 Drilling control and monitoring
- 15 Drilling drain
- 18 Well and riser subsea
- 19 Subsea installation – maintenance and work over
Langfjellet
10-19 Drilling, well and subsea related systems
- 10 Drilling
- 11 Drilling process
- 12 Drilling well control
- 13 Riser and well topside
- 14 Drilling control and monitoring
- 15 Drilling drain
- 18 Well and riser subsea
- 19 Subsea installation – maintenance and work over
Kraftstasjon
80-89 Electrical
- 80 Main power (u =or >6.6 kV)
- 81 Main power (1.0 kV< u < 6.6 kV)
- 82 Main power (u = or <1.0 kV)
- 83 Emergency power (u = or >1.0 kV)
- 84 Emergency power (u<1.0 kV)
- 85 Battery and no-break
- 86 Telecommunication
- 87 Control
- 88 Earthing and lightning